Industrial Projects:
Manufacturing 0-20,000 SF
| Sage Direct - $477,000 |
 |
Construction of a 14,000 square
foot addition off the back of an existing industrial facility,
addition doubled work space for more room for equipment to enhance
our mailing and marketing services. |
| Williams Distributing - $772,000 |
 |
Construction of a 17,000 square
foot addition to an industrial building using a Design/Build approach.
The project consists of 14,800 square feet of warehouse space and
2,200 square feet of office space. The building has 3 bridge cranes
and water reclaim system. |
| Page Hardware - $267,000 |
 |
A 7,072 square foot warehouse facility
with 500 square feet of office build-out constructed of pre-engineered
steel. The building has metal wall panels, a standing seam metal roof
and a single loading dock. |
Manufacturing 20-50,000 SF
| Pioneer Die Sets - $1.1 M |
 |
Construction of new,
4-story multi-use building that includes 38,000 square
feet of space with retail on the lower level and
apartment units on the upper floors. |
| Trendway Corporation - $1.1 M |
 |
Design and construction of a 40,000
square foot addition consisting of 2,000 s. f. of office space and
38,000 s. f. of manufacturing space for the purpose of a new division
called "InterTrend." The conventional steel construction
of the addition included a membrane roof, block walls and insulated
metal panel system. |
| Elenbaas - $1.25 M |
 |
Construction of a 31,000 square
foot building using a Design/Build approach. The project consisted
of 3,000 s. f. of office space and 28,000 s. f. of manufacturing space. |
| Lacks Paint West - $1.14 M |
 |
Construction of a 30,000 square
foot conventional steel addition of manufacturing and office space. |
| Donnelly Les - $864,000 |
 |
Construction of an addition to the
existing building that consists of 24,000 square feet. |
Manufacturing 50,000 + SF
| SYSCO Freezer $7.6 M |
 |
67,400 square foot
cooler/freezer expansion for Sysco Food Services. The existing
207,000 square foot building will be expanded by using a conventional
steel structure, insulated metal panels, an ethylene-glycol sub-surface
heat system at the freezer, and an extra thickness of insulation
in the roof of the entire addition. |
| McCarthy Group $1.9 M |
 |
A 70,000 square feet pre-engineered
building which includes 5,500 square feet of office, warehouse,
and manufacturing space for the production of automotive, health
care, furniture and sporting goods products. This project was fast-tracked
and completed in 90 days. |
| Advance Packaging $11.0 M |
 |
Construction of a large corrugated
paper manufacturing plant with more than 400,000 square feet. One
special feature was the use of imbedded steel rail in the floor
to assist in automatic movement of the finished product throughout
different areas of the plant. |
| Masterpiece Flower Company $2.0 M |
 |
Design/Build construction of a
60,000 s. f. manufacturing facility. One-half of the building contains
a cooler for cut flowers and the other half of the building is
a cross docking facility. There is also 5,000 s. f. of attached
office space. |
| Harbor Industries - $4.0 M |
 |
Construction of a 100,000 square
foot building using a Design/Build approach. The building consists
of warehouse, assembly and shipping areas. |
| Five Star Brands - $5.75 M |
 |
Design and construction of a 230,000
square foot food energy bar manufacturing facility that meets all
FDA requirements. The building includes an R&D area, batch rooms,
mixing rooms, steam clean rooms, cooking room and production area. |
| Gem Industries - $1.84 M |
 |
Construction of a new 86,000 square
foot building. The building consists of 40,000 square feet of warehouse
space, 40,000 square feet of manufacturing space and 6,000 square
feet of office space. |
| Smiths Industries - $12.0 M |
 |
Remodeling and addition construction
using a Design/Build approach. The project consisted of 184,000 square
feet of commercial office space and 140,000 of manufacturing space. |
| Johnson Controls Maplewood Plant - $14.2 M |
 |
A 340,000 square foot complex manufacturing
facility. The building includes a molding facility, a 2-story executive
office, painting operation, an assembly/ distribution area and 39
truck docks. It was constructed of free standing conventional steel
with a masonry, brick, glass and insulated panel exterior. |
Warehouses/Distribution
| Aero Tech X - $2.0 M |
 |
Design/Build of a new building consisting
of 146,250 square feet of multi-tenant warehouse space. Each tenant
has their own office space, docks and utility feeds. |
| West Michigan Floral - $1.05 M |
 |
Construction of a 50,400 square
foot facility consisting of an 11,000 square foot area of controlled
temperature production, 9500 square foot flower cooler, 6150 square
feet of office areas and a 24,750 square foot warehouse area. The
building was constructed using a pre-engineered steel system with
a standing seam metal roof, metal wall panels and decorative block. |
| West Side Beer - $5.53 M |
 |
Construction of an Anheuser-Busch
Distribution facility for Kent County. The project included 425,000
square feet of warehouse space, 8,000 square feet of office space
and a 26,000 square foot reclaim, maintenance and wash building. |
| Lacks Distribution - $4.0 M |
 |
Construction of a new 80,000 square
foot plant with an 8,000 square foot, 2-story office area. The building
was constructed with conventional steel, a membrane roof and recast
concrete wall panels. The office area has a brick exterior. |
|