Design/Build Projects:

Calvin College Vincent and Helen Bunker Interpretive Center - $600,000
Working with Calvin College's Architect, Wolverine CM provided design and construction services for the 5,270 square foot educational interpretive center. This project is an environmentally-friendly building that encompasses multiple sustainable techniques, produces more than 60% of its own operating power and achieved a Gold LEED rating from the U.S. Green Building Council.
Hathaway Professional Center – $1.2 M
A 22,500 square foot building shell for the purpose of medical offices. The building includes a common core area with restrooms and an elevator. The first suite finish was completed by Wolverine Building Group for West Michigan Cardiology.
Foot & Ankle Specialists of West Michigan - $900,000
A Design/Build application for a 5,440 square foot medical office building supporting outpatient surgery, laboratory and specialized solutions. The facility included a waiting/reception area, nurses' station, patient and exam rooms, and additional suport space.
Peregrine Pointe - $1.5 M
Design/Build construction of a two-story office building for Robert Grooters Development Co. Each floor consists of 11,700 square feet. The building's unique design includes stacked stone veneer, heavy timber construction and rough sawn cedar.
Lighthouse Insurance Group- $1.4 M
Construction of a 15,000 square foot functional, yet modern office building with individual offices, a conference room, meeting rooms, and employees' lounge. It was constructed of conventional steel using a Design/Build approach.
Graydon's Crossing - $250,000
Graydon's Crossing, formerly the Scoreboard Saloon, was completely renovated in just under two months using a Design/Build method. The bar area on the first floor was updated and remodeled, while abandoned living space on the second floor was transformed to include restaurant-style seating and an outdoor deck.
Century Center I V - $1.1 M
This is the fourth building constructed in the Century Center development near Rivertown Crossings Mall. This particular building, completed using a Design/Build approach, is a 14,000 square foot strip mall constructed of conventional steel with a masonry exterior and multiple leasable areas.
Georgetown Bible Church- $1.3 M
Design/Build construction of a 2-story addition with 12,000 square feet on the main level and 9,300 square feet of unfinished space on the upper level for future expansion. The project included administrative offices and religious education facilities.It was constructed using a combination of pre-engineered and conventional steel.
Rockford Reformed Church - $1.27 M
A 17,000 square foot, multi-purpose addition was prominantly built in the front of the existing church building using a Design/Build approach. Constructed of pre-engineered steel, the addition provided a gymnasium and multi-purpose space as well as classrooms, a youth center, and nursery.
John Ball Zoo - Primate Exhibit - $3.8 M
Design/Build approach to the exhibit constructed on a small site with extreme elevations. The project includes a natural appearing outdoor containment area with water features, a heated sand pit, rocks and mud banks. For the winter months, there is a multi-level day room area. This project was awarded a 2003 ABC Award of Excellence.