Community Projects:
Municipal
Projects
| Spring Lake Village Hall and Police Department - $1.9 M |
 |
A
complete interior renovation of this historic building
constructed in the late 1930's. The project included
the demolition and reconstruction of nearly 12,000
square feet, including a new floor plan, ADA requirements,
technology upgrades and updating of the mechanical
and electrical systems. |
| Crockery Township Fire Station- $470,000 |
 |
Pre-engineered
construction of a new fire station building using
a Design/Build approach. The project consisted of
3,200 square feet of office and administrative space,
a 4,500 square foot truck bay area and a 720 square
foot mezzanine. It was also designed to be expandable
at both ends. |
| Port Sheldon Township Hall - $291,000 |
 |
Remodeling
of an existing government facility consisting of
5,400 square feet. |
Community
Projects
| Southeast YMCA Teen Center - $620,000 |
 |
Construction of an 8,400 square
foot building. The main floor includes a recreation area, all purpose
area, snack bar, computer center and office space; and a partial second
floor has an Aerobics area and meeting space. The building also included
several skylights and an elevator. |
| Camp Manitou-Lin - $2.4 M |
 |
Construction of a 12,000 square
foot, log exterior lodge with a dining area, kitchen, basketball area,
indoor ropes course, and meeting rooms. |
| Camp Geneva - $2.8 M |
 |
Construction of 16 Cabins and separate dining facilities. Also constructed a lake with an island for the camp's recreational use. |
Libraries
| Timothy C. Hauenstein Reynolds Township Library - $1.1 M |
 |
Construction of a new 9,500 square
foot public library with a masonry exterior and metal framing.
The new facility replaces their old, 1800 square foot library and
allows the area to expand their services with a larger children’s
section, two adult areas, a young adult section, periodicals, and
a meeting room for community use. The structure also includes a
1,220 square foot mezzanine. |
| Spring Lake District Library - $6.0 M |
 |
Construction of a new 34,000 square foot public library, seven times the size of the previous library. It has a glass and masonry exterior with a sophisticated snow melt system leading up to the entrance as well as the book drop areas. The interior space included childrens and adult book areas, a childrens program room, conference room, local history room, training room, a double-sided fireplace with reading area and a meeting room for use by the local community. |
| Fennville District Library - $170,000 |
|
Remodeling of an existing public
library building with more than 7,000 square feet. The project
was completed using a Design/Build approach. |
|